Installation Procedure
- Install the generator. 2
- Generator Bolt 1 - Install and tighten 22 N.m (16 lb ft)
- Battery Positive Cable 4 - Install
- Generator Nut 1 - Install and tighten 15 N.m (11 lb ft)
- Protective Cap 2 - Install
- Electrical Connector 3 - Connect
- Engine Harness 5 - Install
- Harness Conduit Retainer Bolt 2 - Install and tighten 9 N.m (80 lb in)
- Harness Conduit Retainer Nut 1 - Install and tighten 9 N.m (80 lb in)
- Tie Straps 4 - Install
- Connector Retainer 3 - Engage
- Air Conditioning Compressor Hose 1 - Install - Air Conditioning Compressor Hose Replacement
- Air Cleaner Outlet Duct 1 - Install - Air Cleaner Outlet Duct Replacement
- Oil Level Indicator Tube 1 - Install - Oil Level Indicator Tube Replacement
- Drive Belt Idler Pulley 2 - Install - Drive Belt Idler Pulley Replacement
- Connect the negative battery cable. Battery Negative Cable Disconnection and Connection .
CAUTION:
Refer to Fastener Caution .