Installation Procedure
- Generator (2) - Install
- Generator Bolt (1) - Install and tighten [2x] 22 N.m (16 lb ft)
- Battery Positive Cable (2) - Install
- Battery Positive Cable Nut (1) @Generator - Install and tighten 15 N.m (11 lb ft)
- Electrical Connector (1) - Connect
- Position the drive belt tensioner (2).
- Drive Belt Tensioner Bolt (1) - Install and tighten 58 N.m (43 lb ft)
- Accessory Drive Primary Belt - Install - Accessory Drive Primary Belt Replacement
- Intake Manifold (1) - Install - Intake Manifold Replacement
- Connect the battery negative cable. Battery Negative Cable Disconnection and Connection
CAUTION:
Refer to Fastener Caution