Installation Procedure
- Install the screws securing the data link connector to the I/P carrier.
Tighten: Tighten the screws to 2 N.m (18 lb in).
- Install the I/P closeout panel. Refer to Closeout/Insulator Panel Replacement - Left .
NOTE:
Refer to Fastener Notice in Cautions and Notices.