Installation Procedure
- Slide the battery cable (1) through the opening in the cowl panel (3) and seat the cable grommet (2) by pulling the cable forward into the engine compartment.
- Install the battery cable retainer to the body side rail.
- Install the surge tank. Refer to Surge Tank Replacement in Engine Cooling.
- Connect the battery positive cable to the underhood fuse block (2).
Tighten: Tighten the battery positive cable to remote positive terminal nut (1) to 12 N.m (106 lb. in.).
- Route the battery cable (1) along the rocker panel and install the cable retainers (2).
- Install the right closeout insulator panel. Refer to Closeout/Insulator Panel Replacement - Right in Instrument Panel, Gages, and Console.
- Install the interior trim moldings. Refer to Garnish Molding Replacement - Center Pillar (Standard) or Garnish Molding Replacement - Center Pillar (WC2, WC8) in Interior Trim.
- Connect the battery positive cable to the rear fuse block.
Tighten: Tighten the battery positive cable to rear fuse block nut (1) to 15 N.m (11 lb. ft.).
- Connect the battery positive cable (1) to the battery.
Tighten: Tighten the battery cable bolt to 17 N.m (13 lb. ft.).
- Connect the battery negative cable. Refer to Battery Negative Cable Disconnect/Connect Procedure .
NOTE:
Refer to Fastener Notice in Cautions and Notices.