Installation Procedure
- Guide the shift cable assembly into the body tunnel.
- Position the foam spacer 2 above the fuel feed lines. DO NOT allow the foam spacer to come in contact with the fuel lines.
- Place the cable assembly 5 into the funnel bracket 1 located behind the floor shift control.
- Install the retainer 4 into the cable assembly.
- Secure the cable assembly to the ball stud 3 on the floor shift control.
- Place the rear portion of the cable assembly 2 through the transmission bracket 3.
- Secure the cable assembly to the transmission bracket with the retainer 1.
- Secure the cable assembly 1 to the ball stud on the transmission shift lever 2.
- With the shiftier and transmission in the NEUTRAL position, adjust the shift control cable. Refer to Shift Control Linkage Adjustment .
IMPORTANT:
Care should be used when the shift cable is guided between the brake lines and the torque tube to ensure the cable rod end guide tube is not pinched.