Installation Procedure
- Reconnect the engine harness (3) and the knock sensor (2) electrical connectors.
- Position the knock sensor 2 on the engine block (4).
- Install the mounting bolt (1) for the knock sensor 2.
- Tighten the knock sensor mounting bolt (1) and tighten to 20 N.m (15 lb ft).
- Install the left exhaust manifold. Refer to Exhaust Manifold Replacement - Left Side (V6) or Exhaust Manifold Replacement - Left Side (V8) .
- Install the left catalytic convertor. Refer to Catalytic Converter Replacement - Left Side (V6) or Catalytic Converter Replacement - Left Side (V8) .
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
- Program the transmitters. Refer to Transmitter Programming (without RPO Y41) or Transmitter Programming (with RPO Y41 - North America and Asia) or Transmitter Programming (with RPO Y41 - Canada and Europe) .
CAUTION:
Refer to Fastener Caution
.