Installation Procedure
- Install the fuse block (1) to the battery.
- Tighten the battery positive fuse block cable nut (1) Tighten to 4 N.m (35 lb in).
- Confirm that the 2 starter fuse nuts (1) are correctly torqued to 12 N.m (106 lb in).
- Install the 4 body harness terminal nuts (1) Tighten to 4.7 N.m (42 lb in).
- Install the body front wiring harness fuse block nut (1) Tighten to 17 N.m (12 lb ft).
- Install the APM positive cable (2) and APM positive cable nut (1) and Tighten to 12 N.m (106 lb in).
- Install the fuse block cover. Refer to Fuse Block Cover Replacement
- Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .
- Install the rear compartment floor panel front trim. Refer to Rear Compartment Floor Panel Front Trim Replacement
- Enable the high voltage system. Refer to High Voltage Enabling
CAUTION:
Refer to Fastener Caution .
IMPORTANT:
This step is crucial to prevent damage to the fuse block or battery.