Installation Procedure
If you are replacing the battery with a serviced NEW battery, detach the vent plug (1), that comes with the positive post cover.
Install the vent plug (1), opposite side of the battery vent hose (2).
Battery (1) - Install
Battery Vent Tube (2) - Engage
- Battery Hold Down Retainer (3) - Install
- Battery Hold Down Bolt (1) - Install and tighten 22 N.m (16 lb ft)
Spare Wheel Carrier Bracket (2) - Install
- Spare Wheel Stowage Bracket Bolt (1) - Install and tighten [2x] 22 N.m (16 lb ft)
Battery Positive Cable (3) - Install
- Battery Positive Post Clamp Nut (1) - Tighten 4.5 N.m (40 lb in)
- Battery Positive Post Cover (2) - Install
- Connect the negative battery cable. Battery Negative Cable Disconnection and Connection
Spare Tire (2) - Install
- Spare Tire Stowage Retainer (1) - Hand tighten
- Rear Compartment Floor Panel Trim - Install - Rear Compartment Floor Panel Trim Replacement
CAUTION:
Refer to Fastener Caution