Installation Procedure
- Connect the electrical connectors.
- Install the switch bank into the IP by pushing in on the switch bank.
- Install the bolts/screws to secure the switch bank to the instrument panel.
Tighten: Tighten the bolts/screws to 2.5 N.m (22 lb in).
- Install the IP accessory trim plate. Refer to Trim Pad Replacement - Instrument Panel (I/P) Upper .
NOTE:
Refer to Fastener Notice in Cautions and Notices.