Installation Procedure
- Install the shift linkage assembly.
- Install the fixing shaft pin and connect the linkage connection part to the transaxle rear mounting bracket.
- Install the universal joint to the transaxle.
- Install the clip and the bolt from the universal joint.
- Install the rod clamp.
- Adjust the shift linkage. Refer to Shift Linkage Adjustment .
- Connect the negative battery cable.