Instrument Panel Cluster Programming
To program and setup an existing or new replacement instrument panel cluster, perform the following procedure:
- With a scan tool, access the Service Programming System (SPS) and follow the on-screen instructions. Refer to Service Programming System (SPS)
- On the SPS Supported Controllers screen, select IPC Instrument Cluster - Programming and follow the on-screen instructions.
- On the SPS Supported Controllers screen, select IPC Instrument Cluster - Configuration and follow the on-screen instructions.
- On the SPS Supported Controllers screen, select IPC Instrument Cluster - Setup and follow the on-screen instructions.
If the instrument panel cluster fails to accept the program, verify all scan tool and instrument panel cluster connections are secure.
NOTE:
After programming is completed, perform the following to avoid future misdiagnosis:
- Turn the ignition OFF for 10 seconds.
- Open and close the door.
- Connect the scan tool to the data link connector.
- Ignition ON, engine OFF.
- With a scan tool, clear all DTC's from all modules.