Circuit/System Testing
IMPORTANT:
You must complete the Circuit/System Verification before proceeding with Circuit/System Testing.
- Ignition OFF, disconnect the CMP actuator solenoid harness connector at the CMP actuator solenoid.
- Test for less than 5 ohms between the low reference circuit terminal 2 and ground.
- If greater than the specified range, test the low reference circuit for an open/high resistance.
- Verify that a test lamp does not illuminate between the low reference circuit terminal 2 and the control circuit terminal 1.
- If the test lamp illuminates, test the control circuit for short to voltage. If the circuit tests normal, replace the ECM.
- Remove the test lamp.
- Command the CMP Actuator Sol. ON with a scan tool. Verify the scan tool CMP Sol Ckt Short Gnd Test status is OK.
- If not the specified value, test the control circuit for a short to ground. If the circuit tests normal, replace the ECM.
- Install a 3A fused jumper wire between the control circuit terminal 1 and the low reference circuit terminal 2. Command the CMP Actuator Sol. ON with a scan tool. Verify the scan tool CMP Sol Ckt Short Gnd Test status is Fault.
- If not the specified value, test the control circuit for an open/high resistance. If the circuit tests normal, replace the ECM.