Installation Procedure
- Install the engine ground strap bolt (1) and tighten to 25 N.m (18 lb ft).
- Install Front Wheelhouse Liner Front Wheelhouse Liner Replacement (Left Side)Front Wheelhouse Liner Replacement (Right Side)
- Install Retainer (1)
- Install the engine ground strap bolt (1) and tighten to 25 N.m (18 lb ft).
- Install Retainer (1)
- Lower the vehicle.
- Connect Battery Negative Cable Battery Negative Cable Disconnection and Connection
CAUTION:
NOTE:
The bolt is behind the body plate.