Installation Procedure
- Clean the intake manifold mating surfaces (2).
- Install the NEW gasket (1).
- Install Throttle Body (3)
- Install and tighten Bolts (1) (Qty: 4) @ Throttle Body to 10 N.m (89 lb in)
- Connect Electrical Connector (2) @ Throttle Body
- Install Air Cleaner Outlet Duct. Refer to Air Cleaner Outlet Duct Replacement
- Install Dash Upper Extension Panel Opening Cover. Refer to Dash Upper Extension Panel Opening Cover Replacement
- Enable High Voltage System. Refer to High Voltage Enabling
- Perform the throttle learn procedure. Refer to Throttle or Idle Learn
CAUTION:
Refer to Fastener Caution