LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 2017 >> Traverse Premier, FWD >> Repair and Diagnosis (Single Page) >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Diagnostic Information and Procedures >> DTC P1668: Generator L-Terminal Control Circuit >> Circuit/System Testing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit/System Testing

  1. Ignition OFF, disconnect the harness connector at the generator.
  2. Ignition ON, test for less than 1 volt between the generator turn on signal circuit and ground.
    • If greater than the specified value, test the generator turn on signal circuit for a short to voltage. If the circuit tests normal, replace the ECM.
  3. Engine Running, test for greater than 3.5 volts between the generator turn on signal and ground.
    • If less than the specified value, test the generator turn on signal circuit for a short to ground, an open/ high resistance. If the circuit tests normal, replace the ECM.
  4. If the circuit tests normal, test or replace the generator.