Installation Procedure
- Install the accessory dc power control module (9).
- Install the accessory dc power control module bolt (8) and tighten to 22 N.m (16 lb ft).
- Install 2 the accessory dc power control module nuts (1) and tighten to 22 N.m (16 lb ft).
- Install the battery positive and negative cable nuts (B+ APM Module to Battery Fuse Block) (7) and tighten to 22 N.m (16 lb ft).
- Install the battery positive and negative cable nut (APM ground cable) (6) and tighten to 22 N.m (16 lb ft).
- Connect Electrical Connectors (2, 4)
- Install Coolant Hoses (Qty: 2)
- Install Clamps (3, 5) (Qty: 2) using BO-38185 pliers
- Fill the cooling system. Refer to Drive Motor Generator Power Inverter Module Cooling System Draining and Filling
- Connect Battery Negative Cable. Refer to Battery Negative Cable Disconnection and Connection
- Install Rear Compartment Floor Stowage Trim Compartment. Refer to Rear Compartment Floor Stowage Trim Compartment Replacement
- Enable high voltage system. Refer to High Voltage Enabling
CAUTION:
Ensure that all electrical connections are made before the hoses are connected, and the cooling system is filled. Failure to do this may result in damage to the electrical connectors or components. Any damaged electrical connectors or components must be replaced.
Fig 1: Accessory DC Power Control Module, Bolt, Nuts, Coolant Hoses, Clamps And Electrical Connectors
CAUTION:
Refer to Fastener Caution