LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 1995 >> Sebring V6-2.5L VIN N >> Repair and Diagnosis >> Cruise Control >> Cruise Control Switch >> Testing and Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Cruise Control Switch: Testing and Inspection

Fig. 76 On/Off Switch Inspection:





1. Operate On/Off switch and inspect continuity as shown.
2. Connect terminal No. 1 to battery voltage and terminal No. 4 to ground, then place On/Off switch in On position.
3. Inspect voltage between terminal No. 5 and ground, voltage should be 12 volts.
4. Place On/Off switch in Off position, then Inspect voltage between terminal No. 5 and ground. Voltage should be 0 volts.

Fig. 77 SET, RESUME, & CANCEL Switch Inspection:





5. Measure resistance between terminals of SET, RESUME and CANCEL switches as shown.