Full Open Switch: Installation
WARNING: This page is about a different car, the 2005 Dodge Grand Caravan, 2005 Dodge Caravan, and 2005 Chrysler Town & Country. However, it is still accessible from the selected car via links, so may be relevant.
- Perform a wiring repair on the full open switch wires following the approved procedure in WIRING DIAGRAM INFORMATION . Or install new terminals on the wire ends and reinstall in the main liftgate motor electrical connector.
- Position and install the full open switch retaining screw.
- Install the power liftgate lift gear and link rod assembly. (Refer to ELECTRICAL/POWER DOORS/CONTROL ROD - INSTALLATION)
- Connect the battery negative cable.
- Using an appropriate scan tool, check any erase any power liftgate control module diagnostic trouble codes.
- Verify power liftgate system and full open switch operation. Cycle the power liftgate through one complete open and close cycle, this will allow the power liftgate control module to relearn its cycle with the new components.