LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2006 >> PT Cruiser Base, 2D Convertible, Standard >> Repair and Diagnosis (Single Page) >> Accessories & Equipment >> Communication Devices >> Electronic Control Modules (Service Information) >> Module-Gateway >> Installation
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Electronic Control Modules (Service Information): Module-Gateway: Installation

Fig 1: Removing/Installing Module-Gateway
GC0043474Courtesy of DAIMLERCHRYSLER CORP.
  1. Install the Gateway module into the mounting brackets.
  2. Connect the electrical connectors.
  3. Install mounting bolts (1).
  4. Connect the battery negative cable.
  5. Program the Gateway. (Refer to ELECTRICAL/VEHICLE THEFT SECURITY/TRANSPONDER KEY - STANDARD PROCEDURE) .