LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2006 >> Sebring GTC >> Repair and Diagnosis >> External Pages >> Different car >> Section 125 (Battery System) >> Battery >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Section 125 (Battery System): Battery: Installation

WARNING: This page is about a different car, the 2006 Dodge Viper. However, it is still accessible from the selected car via links, so may be relevant.
  1. Position the battery in the battery tray.
  2. Install the battery hold down clamp and bolt. Torque the bolt to 9 N.m (80 in. lbs.).
  3. Connect the battery POSITIVE cable.
  4. Connect the battery NEGATIVE cable.
  5. Install the battery cover.