LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2006 >> Sebring GTC >> Repair and Diagnosis >> External Pages >> Different car >> Section 129 (Starting System) >> Starting >> Diagnosis And Testing >> Diagnosis And Testing - Control Circuit Test >> Notes
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Diagnosis And Testing - Control Circuit Test: Notes

WARNING: This page is about a different car, the 2006 Dodge Viper. However, it is still accessible from the selected car via links, so may be relevant.

The starter control circuit has:

  1. Starter motor with integral solenoid
  2. Starter relay
  3. Body Control Module (BCM)
  4. Ignition switch
  5. Battery
  6. All related wiring and connections
  7. Powertrain Control Module (PCM)
  8. Starter Button
CAUTION: Before performing any starter tests, the ignition and fuel systems must be disabled.
  1. To disable ignition and fuel systems, disconnect the Automatic Shutdown Relay (ASD). The ASD relay is located in the Power Distribution Center (PDC). Refer to POWER DISTRIBUTION .