LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2009 >> Sebring Convertible L4-2.4L >> Repair and Diagnosis >> Powertrain Management >> Emission Control Systems >> Air Injection >> Air Injection Pump >> Service and Repair >> Removal
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Removal






REMOVAL





1. Disconnect and isolate negative battery cable at battery.
2. Remove air inlet tube (3) by pushing the ends (1) together, while pulling the air inlet tube (3) away from air pump housing connection (2).





3. Remove bolt (1) from heat shield (2) and air pump bracket (3).





4. Remove heat shield bolt (1) and heat shield (3) from air pump bracket (2).





5. Disconnect electrical harness connector (1) from the air pump electrical connector (2).
6. Remove air pump mounting nuts (5) from bracket (4).
7. Remove air pump (3) from bracket (4).