LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2010 >> Sebring Convertible L4-2.4L >> Repair and Diagnosis >> Powertrain Management >> Fuel Delivery and Air Induction >> Variable Induction System >> Variable Induction Control Valve >> Service and Repair >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation






INSTALLATION





1. Install o-ring.










2. Align tab on valve to slot in manifold and install.
3. Install mounting screws.
4. Tighten bolts to 2.8 Nm (25 in. lbs.).
5. Connect electrical connector and lock.
6. Install engine cover.
7. Connect negative battery cable.