LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 1995 >> Caravan Base, 3.3 J >> Repair and Diagnosis >> Engine Performance >> System >> Engine Controls - Tests W/Codes - 2.5L >> Verification Tests >> Verification Procedure VER-1
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Verification Procedure VER-1

  1. Inspect vehicle to ensure all engine components are connected. Reassemble and reconnect components as necessary. Inspect engine oil for fuel contamination. Change oil and filter if necessary. Attempt to start engine.
  2. If engine does not start, check if any Technical Service Bulletins (TSB) apply to vehicle and return to TEST TC-1A, if necessary. If engine starts, repair is complete.