LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Fiat >> 2019 >> 500L Pop >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery System (Service Information) >> Battery >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Battery System (Service Information): Battery: Installation

GC0152855Courtesy of CHRYSLER GROUP, LLC
  1. Install the battery (2) into the vehicle.
  2. Install the battery hold down retainer.
  3. Install the battery thermo cover (1).
    GC0152856Courtesy of CHRYSLER GROUP, LLC
  4. Connect the positive battery cable (1).
  5. Connect the negative battery cable (2).
    GC0152857Courtesy of CHRYSLER GROUP, LLC
  6. Install the positive battery terminal cover (1).