LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Ford >> 2009 >> Escape Hybrid, FWD >> Repair and Diagnosis >> Engine Performance >> System >> Engine Controls - Pinpoint Tests - (Hybrid) >> Pinpoint Test To: Generator OVERSPEED >> Test Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Test Procedure

  1. TO1 CHECK FOR CORRECT GENERATOR RPM 
    NOTE: Refer to the table at the beginning of this pinpoint test for correct generator to engine RPM correlations.
    • Clear the TCM DTCs.
    • Access the TCM and monitor the G_SPEED and RPM_TCM PIDs.
    • Place gear selector lever in PARK.
    • Key ON, engine running.
    • Record the generator RPM at different engine speeds.

    Does the generator RPM correspond with the engine RPM in the table? 

    Yes No
    GO to  TO2. INSTALL a new transaxle assembly. REFER to AUTOMATIC TRANSAXLE/TRANSMISSION EXTERNAL CONTROLS .
  2. TO2 CHECK FOR DIAGNOSTIC TROUBLE CODES (DTCS) 

    Is DTC P0C2F present? 

    Yes No
    GO to PINPOINT TEST TP . Unable to duplicate or identify the concern at this time.
    RETURN to part 3, Symptom Charts, to continue diagnosis.