LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> GMC >> 2020 >> Canyon SL >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Starting System And Charging System >> Repair Instructions >> Battery Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

  1. GM3807220Courtesy of GENERAL MOTORS COMPANY

    Install the battery. (1)

  2. GM4565928Courtesy of GENERAL MOTORS COMPANY

    Battery Hold Down Retainer (2) - Install

  3. CAUTION:

    Refer to Fastener Caution .

  4. Battery Hold Down Retainer Rod (1) - Install and tighten 22 N.m (16 lb ft)
  5. GM4565922Courtesy of GENERAL MOTORS COMPANY

    Battery Hold Down Retainer (2) - Install

  6. Battery Hold Down Retainer Nut (1) - Install and tighten 22 N.m (16 lb ft)
  7. GM4565911Courtesy of GENERAL MOTORS COMPANY

    Front Compartment Fuse Block (3) - Install

  8. Engage the retaining tabs. (2)
  9. Battery Positive Post Clamp Nut (1) - Install and tighten 4.5 N.m (40 lb in)
  10. GM4565898Courtesy of GENERAL MOTORS COMPANY

    Battery Positive Cable (1) - Install

  11. Front Compartment Fuse Block Cable Nut (2) - Install and tighten 15 N.m (11 lb ft)
  12. Close the battery fuse block cover. (3)
  13. Connect the battery negative cable. Battery Negative Cable Disconnection and Connection .