LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> GMC >> 2021 >> Acadia SL >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Starting System And Charging System - Repair Instructions >> Repair Instructions >> Battery Monitor Module Replacement (KL9) >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

  1. Battery Monitor Module (3) - Install
    GM4285192Courtesy of GENERAL MOTORS COMPANY
  2. CAUTION:

    Refer to Fastener Caution

  3. Battery Post Negative Cable Clamp Nut (1) - Tighten 4.5 N.m (40 lb in)
  4. Electrical Connector (2) - Connect
  5. Battery Negative Cable (3) - Install
    GM4285190Courtesy of GENERAL MOTORS COMPANY
  6. Use an open ended wrench to hold the battery sensor ground tab, while tightening the battery negative cable nut. (2)
  7. Battery Negative Cable Nut (1) @ Battery Monitor Module - Tighten 11 N.m (97 lb in)
  8. Perform the battery sensor learn procedure. Battery Sensor Module Learn