LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Honda >> 2000 >> Insight L3-1.0L Hybrid >> Repair and Diagnosis >> Power and Ground Distribution >> Mini ISO Relay >> Testing and Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Mini ISO Relay: Testing and Inspection


Normally-Open Type A




Fuel Cut/PGM-FI Main - Relay:





1. Turn the battery module switch OFF, and measure the voltage.
2. Check for continuity between the terminals.
- There should be continuity between the No.1 and No.2 terminals when power and ground are connected to the No.3 and No.4 terminals.
- There should be no continuity between the No.1 and No.2 terminals when power is disconnected.


Normally-Open Type B




EPS Motor Relay:






1. Turn the battery module switch OFF, and measure the voltage.
2. Check for continuity between the terminals.
- There should be continuity between the No.1 and No.3 terminals when power and ground are connected to the No.2 and No.4 terminals.
- There should be no continuity between the No.1 and No.3 terminals when power is disconnected.