Installation Procedure
WARNING: This page is about a different car, the 2004 GMC Sierra and 2004 Chevrolet Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Install the PCM.
Ensure that the mounting tabs are engaged.
- Secure the spring latch to the PCM.
- Connect the PCM electrical connectors.NOTE: Refer to Fastener Notice in Cautions and Notices.
- Tighten the PCM electrical connector bolts (2).
Tighten: Tighten the bolts to 8 N.m (71 lb in).
- Install the PCM cover.
Ensure the mounting tabs are engaged into the mounting holes in the cover.
- If a NEW PCM was installed, program the PCM. Refer to Service Programming System (SPS) in Programming.
- Perform the crankshaft position (CKP) system variation learn procedure. Refer to CKP System Variation Learn Procedure .