Installation Procedure
- Insert the generator positive cable into the battery cables harness conduit.
- Install the positive cable clip (3) to the engine wiring harness bracket.
- Connect the generator positive lead (2) to the generator and install the generator output BAT terminal nut (1) and tighten to 20 N.m (15 lb ft).
- Position the protective boot onto the generator output BAT terminal.
- Install the nut (1) securing the generator positive cable inner terminal to the underhood fuse block and tighten to 10 N.m (89 lb in).
- Install the left front wheelhouse liner. Refer to Front Wheelhouse Liner Replacement .
- Install the underhood fuse block cover to the underhood fuse block, engaging the locking tabs.
- Install the battery cable harness clips (1, 2) to the battery tray.
- Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .
CAUTION:
Refer to Fastener Caution
.