LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Hyundai >> 2008 >> Entourage GLS >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System Diagnosis (2 Of 2) >> DTC Troubleshooting Procedures >> DTC P050B Cold Start Ignition Timing Performance >> Component Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Component Inspection

  1. Check Ignition Coil
    1. IG "OFF" and disconnect ignition coil connector.
    2. Measure resistance between terminals 1 and 2 of ignition coil connector. (Component side)
    3. Measure resistance between terminal 1 of ignition coil connector and out terminal of secondary ignition coil.

      SPECIFICATION: 

      RESISTANCE SPECIFICATION CHART

      Resistance (Ω) Primary Coil (A) Secondary Coil (B)
      0.62 ± 10% (Ω) 7.0 ± 15% (kΩ)
      Fig 1: Measuring Resistance Between Terminals 1 And 2 Of Ignition Coil Connector (Component Side)
      G05535902Courtesy of HYUNDAI MOTOR CO.
    4. Is the measured resistance within specification?

      YES 

      • Substitute with a known - good PCM and check for proper operation
      • If the problem is corrected, replace PCM and go to "VERIFICATION OF VEHICLE REPAIR " procedure.

      NO 

      • Substitute with a known - good Ignition Coil and check for proper operation.
      • If the problem is corrected, replace Ignition Coil and go to "VERIFICATION OF VEHICLE REPAIR " procedure.
      NOTE: There is a memory reset function on scantool that can erase optional parts automatically detected and memorized by PCM. After testing PCM on the vehicle, use this function to reuse the PCM on the others