LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Infiniti >> 2008 >> M35 Base >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System (VQ35DE) - DTCS P0451 To P1217 >> DTC P0850: PNP Switch >> Overall Function Check >> With GST
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

With GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    VOLTAGE SPECIFICATION CHART

    Position (Selector lever) Voltage (Known good data)
    P or N position Approx. 0V
    Except above position BATTERY VOLTAGE (11 - 14V)
  3. If NG, go to "DIAGNOSTIC PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 102 And Ground
    G04900583Courtesy of NISSAN MOTOR CO., U.S.A.