Installation (4x4 Model)
- Install power steering unit to crossmember.
Tighten fixing bolt to specified torque.
Torque: 116 N.m (85 lb ft)
- Install power steering unit with crossmember to frame by aligning the setting marks made when removing.
Tighten crossmember mounting bolt to specified torque.
Torque: 173 N.m (128 lb ft)
- Install lower control arm bolt. Refer to SUSPENSION FRONT .
- Install torsion bar. Refer to SUSPENSION FRONT .
- Connect the feed line and return line.
Torque: 25 N.m (18 lb ft)
- Install tie-rod end assembly to knuckle.
Torque: 118 N.m (87 lb ft)
- Align the setting marks made at removal.
- Install the universal joint assembly to the transfer gear assembly.
Temporary tighten the universal joint bolt.
- Install the universal joint assembly to the power steering unit assembly.
Temporary tighten the universal joint bolt.
- Install the transfer gear assembly to frame.
Torque: 54 N.m (40 lb ft)
- Tighten the universal joint bolt to the specified torque.
Torque: 31 N.m (23 lb ft)
- Install the stone guard.
- Bleed the system. Refer to BLEEDING THE POWER STEERING .