Installation Procedure
- Insert the generator positive cable (3) into the battery cables harness conduit.
- Connect the generator lead (5) to the generator and install the generator output BAT terminal nut (6).
Tighten: Tighten the nut to 20 N.m (15 lb ft).
- Press the protective boot (4) on to the generator output BAT terminal (2).
- Install the nut (2) securing the generator positive cable (5) to the underhood fuse block (1).
Tighten: Tighten the nut to 10 N.m (89 lb in).
- Install the underhood fuse block cover to the underhood fuse block, engaging the locking tabs.
- Close the battery cables harness retainer (3).
- Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .
NOTE:
Refer to Fastener Notice
.