LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jaguar >> 1991 >> Sovereign L6-4.0L >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Technical Service Bulletins >> All Technical Service Bulletins >> JDS - Software Changes >> Software Use >> Cruise Control
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Cruise Control

NOTE: During a cruise control test JDS may instruct the operator to disconnect connector LB35 and perform a wire resistance check. JDS does not request that the operator reconnect LB35 after the resistance check.


Whenever LB35 is opened; a resistance reading is taken (using the reference and measurement probes); and, an additional measurement is requested: ALWAYS CONNECT LB35 BEFORE USE OF THE MEASUREMENT OR CURRENT PROBES.