LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2005 >> Grand Cherokee 2WD V8-5.7L VIN 2 >> Repair and Diagnosis >> Starting and Charging >> Starting System >> Testing and Inspection >> Control Circuit Testing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Control Circuit Testing

The starter control circuit components should be tested in the order in which they are listed, as follows:
- Starter Relay - Refer to Starter Relay Diagnosis and Testing.
- Starter Solenoid - Refer to Starter Motor Diagnosis and Testing.
- Ignition Switch - Refer to Ignition Switch and Key Lock Cylinder
- Park/Neutral Position Switch - Refer to Park/Neutral Position Switch in Transmission.
- Wire harnesses and connections - Refer to Wiring Diagrams.