LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2015 >> Compass Limited, AWD, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (2.0L Engine (Service Information)) >> Engine Block >> Frame, Ladder >> Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Frame, Ladder: Installation: Installation

WARNING: This page is about a different variant/trim than selected.
Fig 1: Sealing Ladder Frame
GC0084845Courtesy of CHRYSLER GROUP, LLC
NOTE:

When using RTV, the sealing surfaces must be clean and free from grease and oil.

NOTE:

When using RTV, parts should be assembled in 10 minutes and tighten to final torque within 45 minutes.

  1. Apply a 2 mm bead of Mopar® engine sealant RTV or equivalent as shown in illustration.
    Fig 2: Ladder Frame Bolts Tightening Sequence
    GC0084846Courtesy of CHRYSLER GROUP, LLC
  2. Install bolts and tighten as shown in illustration following a two step method.
    • First: All to 10 N.m (89 in. lbs.).
    • Second: All to 26 N.m (19 ft. lbs.).
  3. Install balance shaft module. Refer to PUMP, ENGINE OIL, INSTALLATION  .
  4. Install oil pan. Refer to PAN, OIL, INSTALLATION  .
  5. Install the transmission to the engine.
  6. Install the engine. Refer to ENGINE, INSTALLATION  .