CVT Automatic Transmission (Service Information): Installation: Installation
NOTE:
Refer to the following table when the Transmission Control Module (TCM) and/or transmission has been replaced to determine if the TCM memory must be erased.
| TCM | Transaxle | Erase Memory? |
|---|---|---|
| New Module | Not Replaced | Not Required |
| Not Replaced | Replaced | Relearn Required. Refer to MODULE, TRANSMISSION CONTROL, STANDARD PROCEDURE . |
| Replaced With Used Module | N/A |
NOTE:
Verify that both dowel pins are present in the engine before installing the transmission.
- Lift transmission into position.
- Install the transmission cooler lines.
- Install the lower transmission bell housing bolts (2) and tighten to 48 N.m (35 ft. lbs.).
- Raise the transmission using a screw jack (2).
- Install the transmission crossmember and bolts (2) tighten to 75 N.m (55 ft lbs.).
- Install the through bolt at the front transmission mount (1) and tighten to 75 N.m (55 ft lbs.).
- Install rear mount through bolt (1) and tighten bolt to 75 N.m (55 ft lbs.).
- Install rear mount to transmission and tighten bolts (1) to 75 N.m (55 ft lbs.).
- Install new converter bolts (1) and tighten to 48 N.m (35 ft. lbs.).
- Install cover at torque converter (1).
- Install the Power Transfer Unit (PTU), if equipped. Refer to INSTALLATION .
- Install the right and left front lower splash shields.
- Install the front skid plate, if equipped.
- Install left half and right half shafts to the transmission. Refer to INSTALLATION .
- Install both front wheels. Refer to INSTALLATION .
- Lower vehicle.
- Install upper bell housing bolts (1) and tighten to 48 N.m (35 ft. lbs.).
- Install the upper mount bolts and tighten to 75 N.m (55 ft lbs.).
- Install the upper mount through bolt and tighten to 75 N.m (55 ft lbs.).
- Install the throttle body support bracket (1) and tighten to 11 N.m (105 in. lbs.).
- Connect the transmission vent tube (1).
- Install the heater hose at transmission cooler tube (3).
- WITH FLUID COOLER , connect the coolant hoses (1) and the transmission fluid lines (2) to the transmission cooler.
- WITH BYPASS VALVE , connect the transmission fluid lines (1) to the transmission fluid bypass valve plate.
- Install the shifter cable (1) and bracket (2), tighten nut to 11 N.m (105 in. lbs.).
- Install the vacuum supply lines.
- Install intake air tube (1).
- Fill engine coolant system. Refer to STANDARD PROCEDURE .
- Install the battery tray (1). Refer to TRAY, BATTERY, INSTALLATION .
- Install the battery. Refer to BATTERY, INSTALLATION .
- Install the air cleaner assembly (1). For 2.0L, refer to BODY, AIR CLEANER, INSTALLATION . For 2.4L, refer to BODY, AIR CLEANER, INSTALLATION .
- Connect battery cables (2).
- Install the transmission fill tube (1) tighten bolt to 9 N.m (79 in. lbs.).
- Fill the transmission with fluid to the correct level.CAUTION:
Use only MOPAR ® CVTF +4. Use of any other type of automatic transmission fluid may cause damage to the transaxle.
- Road test vehicle and inspect for leaks.