Module, Power Liftgate Control (PLGM): Installation
WARNING: This page is about a different car, the 2017 Jeep Cherokee. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
The foam water shield is a one time use component. When removing the foam water shield, discard and replace it with new.
- Connect the two electrical connectors to the PLGM.
- Position the PLGM (3) into the new foam water shield (2).
- Route the harness (1) properly through the harness opening of the foam water shield.
- Wipe the PLGM mounting panel with an alcohol wipe to ensure that there is no dirt or oil on the panel.
- Align and secure the module with the foam water shield to the body panel mounting panel tabs.
- Install the rear cargo load floor. Refer to LOAD FLOOR, CARGO, INSTALLATION .
- Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector to the negative battery cable.
- Perform the power liftage teach procedure. Refer to MODULE, POWER LIFTGATE CONTROL (PLGM), MODULE PROGRAMMING .