LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2019 >> Renegade Trailhawk >> Repair and Diagnosis >> Engine Performance >> System >> 1.3L - DTCS P02F0 To P0600 >> DTC Troubleshooting >> P058C-Battery Monitor Module Temperature Monitoring Performance >> Diagnostic Test
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Diagnostic Test

  1. READ AND RECORD DTCS AND ENVIRONMENTAL DATA - ERASE DTCS AND CHECK FOR THE DTC TO RETURN 
    1. With the scan tool, read DTCs in all Electronic Control Units (ECUs) and record on the repair order.
    2. For future reference, with the scan tool, run and save a vehicle Scan Report and all related recorded data.
    3. With the scan tool, erase all DTCs.
    4. Turn the ignition off for a minimum of 10.0 seconds.
    5. Turn the ignition on.
    6. Using the When Monitored and Set Conditions above and recorded data, operate the vehicle in the conditions that set the DTC.
    7. With the scan tool, read DTCs.

      Did the DTC return?

      Yes 

      • Go To  2

      No 

  2. CHECK FOR OTHER DTCS 
    1. Refer to the recorded DTCs.

      Are there any charging system DTCs present?

      Yes 

      No 

      • Go To  3
  3. CHECK THE IBS (A916) FUSED B+ CIRCUIT FOR HIGH RESISTANCE BY LOAD TESTING THE CIRCUIT 
    NOTE:

    Read the CIRCUIT LOAD TESTING PROCEDURE for information on building a simple load test tool and for additional load testing information and alternative methods of load testing or voltage drop testing a circuit. Refer to CIRCUIT LOAD TESTING PROCEDURES .

    1. Turn the ignition off.
    2. Disconnect the IBS harness connector.
      CAUTION:

      Do not load test any circuits with components still connected to the circuit.

    3. Turn the ignition on.
    4. Load test the IBS (A916) Fused B+ circuit at the IBS harness connector (A). Note:  Refer to the diagram below.
      GC0174938Courtesy of CHRYSLER GROUP, LLC
      NOTE:

      The bulb on the load test tool should be illuminated and bright if there is no resistance in the circuitry. Compare the brightness of the bulb in the load test tool to that of a direct connection across Battery.

      Is the load test bulb illuminated and bright?

      Yes 

      • Go To  4

      No 

      • Repair the IBS (A916) Fused B+ circuit for an open or high resistance. If the fuse is found to be open, check the circuit for a short to ground.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
  4. CHECK THE BATTERY NEGATIVE (-) CABLE FOR HIGH RESISTANCE 
    1. Turn the ignition on.
    2. Measure the voltage between the B (-) cable engine ground and the Battery Negative (-) Post.

      Is the voltage above 0.25 volts?

      Yes 

      • Repair the Battery Negative (-) circuit for high resistance.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .

      No 

      • Go To  5
  5. REPLACE THE INTELLIGENT BATTERY SENSOR (IBS) 

    The Intelligent Battery Sensor is reporting an irrational temperature signal, view repair to continue.

    Repair