Control Circuit Inspection
- IG "OFF".
- Disconnect A/C Relay.
- IG "ON".
- Measure the voltage between terminal 5 of A/C relay and ground.
Specification: Approx. 11V
- Is the measured voltage within specification?
YES
- Go to "COMPONENT INSPECTION " procedure.
NO
- Repair Short to ground in A/C relay control circuit and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.