LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Kia >> 2009 >> Amanti >> Repair and Diagnosis >> Engine Performance >> System >> DTC Troubleshooting Procedures (2 Of 2) >> DTC Troubleshooting Procedures >> DTC P0685 ECM/Pcm Power Relay Control Circuit /Open >> Control Circuit Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Control Circuit Inspection

  1. Check short in harness
    1. IG "OFF".
    2. Disconnect Main Relay and PCM connector.
    3. Measure resistance between terminal 4 of Main Relay and chassis ground.
    4. Measure resistance between terminals 4 and 2 of Main Relay.

      Specification : Infinite

      Fig 1: Measuring Resistance Between Terminals 4 And 2 Of Main Relay
      G00489926Courtesy of KIA MOTORS AMERICA, INC.
    5. Is the measured resistance within specification ?

      YES 

      • Go to  2"Check open in harness" as follows.

      NO 

  2. Check open in harness
    1. IG "OFF".
    2. Disconnect Main Relay and PCM connector.
    3. Measure resistance between harness terminal 4 of Main Relay and harness terminal 43 of PCM harness connector.

      Specification : Approx. below 1Ω

      Fig 2: Measuring Resistance Between Terminal 4 Of Main Relay Harness Connector And Terminal 43 Of PCM Harness Connector
      G00489906Courtesy of KIA MOTORS AMERICA, INC.
    4. Is the measured resistance within specifications ?

      YES 

      NO