LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Kia >> 2009 >> Spectra5 2.0 1, Automatic >> Repair and Diagnosis >> Engine Performance >> System >> DTC Troubleshooting Procedures (1 Of 2) >> P0036: Ho2S Heater Control Circuit (Bank1/Sensor2) >> Control Circuit Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Control Circuit Inspection

  1. Check for open in control harness.
    1. Ignition "OFF".
    2. Disconnect PCM connector
    3. Measure resistance between terminals 4 of the HO2S heater harness connector and 9 of the PCM harness connector.

      Specification: Approx 0Ω

      Fig 1: Measuring Resistance Between Terminals 4 Of HO2S Heater Harness And 9 Of PCM Harness Connector
      G06414817Courtesy of KIA MOTORS AMERICA, INC.
    4. Is resistance within the specification?

      YES 

      • Go to step  2.

      NO 

  2. Check for short to ground in control circuit.
    1. Measure resistance between terminal 4 of the HO2S heater harness connector and chassis ground.

      Specification: infinite

      Fig 2: Measuring Resistance Between Terminal 4 Of HO2S Heater Harness Connector And Chassis Ground
      G06414818Courtesy of KIA MOTORS AMERICA, INC.
    2. Is resistance within the specification?

      YES 

      • Go to step  3.

      NO 

  3. Check for short to power in control circuit.
    1. Reconnect the PCM connector.
    2. Ignition "ON" & Engine "OFF"
    3. Measure voltage between terminal 4 of the HO2S heater harness connector and chassis ground

      Specification: Approx 0V

      Fig 3: Measuring Voltage Between Terminal 4 Of HO2S Heater Harness Connector And Chassis Ground
      G06414819Courtesy of KIA MOTORS AMERICA, INC.
    4. Is voltage within the specification?

      YES 

      NO