LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Kia >> 2009 >> Spectra5 2.0 1, Standard >> Repair and Diagnosis >> Engine Performance >> System >> DTC Troubleshooting Procedures (1 Of 2) >> P0032: Ho2S Heater Control Circuit High (Bank1/Sensor1) >> Control Circuit Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Control Circuit Inspection

  1. Check for open in control harness.
    1. Ignition "OFF".
    2. Disconnect HO2S and PCM connectors
    3. Measure resistance between terminals 6 of the HO2S heater harness connector and 8 of the PCM harness connector

      Specification: Approx 0Ω

      Fig 1: Measuring Resistance Between Terminals 6 Of HO2S Heater Harness Connector And 8 Of PCM Harness Connector
      G06414809Courtesy of KIA MOTORS AMERICA, INC.
    4. Is resistance within the specification?

      YES 

      • Go to step  2.

      NO 

  2. Check for short to battery in control circuit.
    1. Reconnect the PCM connector.
    2. Ignition "ON" & Engine "OFF"
    3. Measure voltage between terminal 3 of the HO2S heater harness connector and chassis ground.

      Specification: Approx 0V

      Fig 2: Measuring Voltage Between Terminal 3 Of HO2S Heater Harness Connector And Chassis Ground
      G06414810Courtesy of KIA MOTORS AMERICA, INC.
    4. Is voltage within the specification?

      YES 

      NO