Signal Circuit Inspection
- Check for Open or Short in signal circuit
- IG KEY "OFF".
- Disconnect IATS connector.
- IG KEY "ON" & ENG "OFF"
- Measure voltage between signal terminal of IATS harness connector and chassis ground.
Specification : Approx. 5V
- Is the measured voltage within specification?
YES
Go to "Check for Short to ground in signal circuit " procedure.
NO
Check for Open or Short in signal circuit. Repair as necessary and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.
- Check for Short to ground in signal circuit
- IG KEY "OFF".
- Disconnect IATS and ECM connector.
- Measure resistance between signal and ground terminals of IATS harness connector.
Specification : Infinite
- Is the measured resistance within specification?
YES
Go to "GROUND CIRCUIT INSPECTION " procedure.
NO
Check for Short to ground in signal circuit.
Repair as necessary and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.