Control Circuit Inspection
- Ignition "OFF".
- Refer to "O2 SENSOR CONNECTOR REMOVAL " and disconnect Upstream O2 Sensor connector.
- Ignition "ON".
- Measure voltage between Pin No. 5 (Control) terminal of Upstream O2 Sensor harness connector and chassis ground.
Specification: Approx. 2.5V
- Is the measured value within specification?
YES
- Go to "COMPONENT INSPECTION " procedure.
NO
- Repair open or short in control circuit between Upstream O2 Sensor and PCM and then go to "Verification Of Repair " procedure.