Battery Smart Unit: Installation
- INSTALL BATTERY SMART UNIT
- Install the battery smart unit to the battery carrier with the nut.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
CAUTION: Wear insulated gloves.
- Install the battery smart unit to the battery carrier with the nut.
- INSTALL HV RELAY ASSEMBLY (See INSTALLATION )
- INSTALL NO. 6 BATTERY CARRIER PANEL (See INSTALLATION )
- INSTALL BATTERY CARRIER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL BATTERY BRACKET SUB-ASSEMBLY (See INSTALLATION )
- CONNECT FRAME WIRE (See INSTALLATION )
- INSTALL NO. 3 HV BATTERY EXHAUST DUCT (See INSTALLATION )
- REMOVE TOOL BOX
- INSTALL LUGGAGE COMPARTMENT FRONT TRIM COVER (See INSTALLATION )
- INSTALL ROPE HOOK ASSEMBLY (See INSTALLATION )
- INSTALL TOOL BOX
- INSTALL LUGGAGE COMPARTMENT TRIM SIDE COVER RH
- INSTALL SERVICE PLUG GRIP (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- INSTALL BATTERY SERVICE HOLE COVER LH (See INSTALLATION )
- INSTALL LUGGAGE COMPARTMENT FLOOR MAT
- PERFORM INITIALIZATION
- Perform initialization procedure (see
INITIALIZATION (2006/02-2006/07)
).
HINT:
Some vehicle systems require initialization after reconnecting the cable to the negative battery terminal.
- Perform initialization procedure (see
INITIALIZATION (2006/02-2006/07)
).