LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2007 >> GS 450h >> Repair and Diagnosis >> Hybrid/Electric Powertrain >> Battery Management Systems >> Hybrid Battery Control >> Battery Smart Unit >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Battery Smart Unit: Installation

  1. INSTALL BATTERY SMART UNIT 
    1. Install the battery smart unit to the battery carrier with the nut.

      Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf) 

      CAUTION: Wear insulated gloves.
      Fig 1: Locating Battery Smart Unit Nut
      G05304957Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL HV RELAY ASSEMBLY (See  INSTALLATION   ) 
  3. INSTALL NO. 6 BATTERY CARRIER PANEL (See  INSTALLATION   ) 
  4. INSTALL BATTERY CARRIER SUB-ASSEMBLY (See  INSTALLATION   ) 
  5. INSTALL BATTERY BRACKET SUB-ASSEMBLY (See  INSTALLATION   ) 
  6. CONNECT FRAME WIRE (See  INSTALLATION   ) 
  7. INSTALL NO. 3 HV BATTERY EXHAUST DUCT (See  INSTALLATION   ) 
  8. REMOVE TOOL BOX 
  9. INSTALL LUGGAGE COMPARTMENT FRONT TRIM COVER  (See INSTALLATION )
  10. INSTALL ROPE HOOK ASSEMBLY (See  INSTALLATION   ) 
  11. INSTALL TOOL BOX 
  12. INSTALL LUGGAGE COMPARTMENT TRIM SIDE COVER RH 
  13. INSTALL SERVICE PLUG GRIP (See  INSTALLATION   ) 
  14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  15. INSTALL BATTERY SERVICE HOLE COVER LH (See  INSTALLATION   ) 
  16. INSTALL LUGGAGE COMPARTMENT FLOOR MAT 
  17. PERFORM INITIALIZATION 
    1. Perform initialization procedure (see INITIALIZATION (2006/02-2006/07) ).

      HINT:

      Some vehicle systems require initialization after reconnecting the cable to the negative battery terminal.