Inspection Procedure
- PERFORM ACTIVE TEST USING TECHSTREAM (CRUISE CONTROL INDICATOR LIGHT)
- Select the Active Test, use the Techstream to generate a control command, and then check that the combination meter operates.
Combination Meter
COMBINATION METER REFERENCE CHARTTester Display Test Part Control Range Diagnostic Note Indic. Lamp Cruise CRUISE main indicator light ON/OFF - OK:
Indicator light turns on.
NG: GO TO METER/GAUGE SYSTEM (See PROBLEM SYMPTOMS TABLE )
OK: Go to next step
- Select the Active Test, use the Techstream to generate a control command, and then check that the combination meter operates.
- READ VALUE USING TECHSTREAM (CRUISE CONTROL INDICATOR LIGHT)
- Check the Data List for proper functioning of the CRUISE main indicator light.
Cruise Control
CRUISE CONTROL REFERENCE CHARTTester Display Measurement Item/Range Normal Condition Diagnostic Note CCS Ready M-CPU Cruise control system standby condition (Main CPU)/ON or OFF ON: Cruise control main switch (Main CPU) is SET
OFF: Cruise control main switch (Main CPU) is UNSET- CCS Indicator M-CPU Cruise indicator signal (Main CPU)/ON or OFF ON: CRUISE main indicator light is ON
OFF: CRUISE main indicator light is OFF- OK:
When cruise control main switch operation is performed, the result will be same as above.
NG: REPLACE ECM (See REMOVAL )
OK: PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE (See PROBLEM SYMPTOMS TABLE )
- Check the Data List for proper functioning of the CRUISE main indicator light.