Frame Wire: Installation: Installation
- INSTALL FRAME WIRE WARNING: Wear insulated gloves.
- Install the frame wire with 3 new clamps.
- Insert the frame wire into the floor panel hole.TEXT IN ILLUSTRATION
*a Front Side - Install the nut and clamp.
Torque: 8.4 N*m (85 kgf*cm, 74 in.*lbf)
- Install the nut and clamp.
Torque: 8.4 N*m (85 kgf*cm, 74 in.*lbf)
- Connect a new clamp.
- Install the nut and a new clamp.
Torque: 8.4 N*m (85 kgf*cm, 74 in.*lbf)
- Install the nut, bolt and heater pipe.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Install the nut and clamp.
Torque: 8.4 N*m (85 kgf*cm, 74 in.*lbf)
- Connect the 2 wire harness clamps.
- Engage the 6 claws to install the wire harness protector.
- Connect the connector to the engine room junction block assembly.
- Connect the No. 2 engine room wire with the bolt and 2 claws.
Torque: 8.4 N*m (85 kgf*cm, 74 in.*lbf)
- Install the No. 1 relay block cover and 2 clamps.
- Install the relay block cover.
- Engage the 3 claws.
- Connect the 3 wire harness clamps to the floor panel.
- Install the wire harness protector and connect the clamp to the floor panel.
- CONNECT CABLE TO HYBRID BATTERY JUNCTION BLOCK ASSEMBLY WARNING: Wear insulated gloves.
- Connect the frame wire with the clamp and 2 nuts.TEXT IN ILLUSTRATION
*1 Red Tape Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
NOTE:- Make sure that the ends of the frame wire do not cross over each other.
- Be sure to connect the frame wire to each correct terminal as shown.
- Install the battery shield contact.TEXT IN ILLUSTRATION
*1 Battery Shield Contact *2 Frame Wire NOTE: Be sure to install the battery shield contact in the correct direction.
- Connect the frame wire with the clamp and 2 nuts.
- CHECK HIGH VOLTAGE CABLE CONNECTION CONDITION See step 5
- CONNECT NO. 4 HYBRID BATTERY SHIELD PANEL WARNING: Wear insulated gloves.
- Install the No. 4 hybrid battery shield panel with the 3 bolts and nut.TEXT IN ILLUSTRATION
*1 Battery Cover Lock Striker *a Push Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Install the battery cover lock striker, then push the button to lock it.
- Connect the frame wire and install the nut.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
- Install the nut and connect the ground cable.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Install the No. 4 hybrid battery shield panel with the 3 bolts and nut.
- CONNECT CABLE TO BATTERY TERMINAL
- Install the nut and clamp.
Torque: 7.6 N*m (77 kgf*cm, 67 in.*lbf)
- Install the terminal cover.
- Install the nut and clamp.
- INSTALL REAR SEATBACK ASSEMBLY
HINT:
Refer to INSTALLATION .
- INSTALL REAR FLOOR SIDE MEMBER COVER RH
- Install the rear floor side member cover RH with the 2 bolts and 2 clips.
- INSTALL FRONT CENTER FLOOR COVER RH
- Install the front center floor cover RH with the 3 clips.
- INSTALL FRONT FLOOR COVER RH
- Install the front floor cover RH with the bolt and 4 clips.
- INSTALL INTAKE MANIFOLD
HINT:
Refer to INSTALLATION .
- INSTALL INVERTER WITH CONVERTER ASSEMBLY
HINT:
Refer to INSTALLATION .